R&D Center
World Energy Research Institute will broaden the scope of its development areas in addition to absorption chillers and chillers to create a better future. Based on long experience and technological knowhow, the institute will engage in efforts to promote continuous growth by broadening its research activities.Date of establishment (the first approval date) : Jan. 25, 2011
Name : World Energyresearch institute
Location : 3rd Fl., 21, Changmal 1-gil, Sangnok-gu, Ansan-si, Gyeonggi-do, Republic of Korea (15521)
Development field : Design and control of absorption chiller
Research Performance
Name of research commission | Service supplier | Service term | Service completion day |
---|---|---|---|
Cooling, heating and hot water supply 2-stage absorption chiller development service | Korea District Heating Corp | 19 months | 2015. 03 |
Research service for developing a prototype of high-efficiency low-temperature water 2-stage Absorption chillers | Korea District Heating Corp | 21 months | 2014. 03 |
Project for developing absorption heat pumps |
Ministry of Knowledge Economy, Korea Institute of Energy Technology Evaluation and Planning |
24 months | 2013. 06 |
Project for developing Absorption chillers for ships (on condition of purchasing) | Ministry of SMEs and Startups, Korea Evaluation Institute of Industrial Technology, Samsung Heavy Industries |
12 months | 2012. 05 |
Development of a vacuum concentration system (in the third year in three years) | Korea Environmental Industry Technology Institute | 40 months | 2011. 08 |
Analysis of cases regarding application of absorption heat pumps |
Korea District Heating Engineering Co., Ltd |
6 months | 2010. 05 |
Test for demonstrating the effects of differential temperature improvement following improvement of district heating flow control systems |
Korea District Heating Engineering Co., Ltd |
6 months | 2010. 05 |
Survey of actual conditions of district chilling apartment house chilling system operation |
Korea District Heating Corp | 22 months | 2010. 06 |
Development of a low-temperature water 2-stage absorption chilling and heating system |
Korea District Heating Corp | 19 months | 2009. 03 |
Service for optimizing apartment house district chilling |
Korea District Heating Corp Korean Association of Air Conditioning, Refrigerating and Sanitary Engineers |
7 months | 2007. 09 |
Installation of welded plate-type heat exchangers and field tests |
Korea District Heating Engineering Co., Ltd |
25 months | 2008. 06 |
Designing of special Absorption chillers for chemical plants |
Century Corp | 6 months | 2007. 03 |
Single Effect 2 Lift Hot water Driven Absorption chiller (75~820RT) | UTC Power UTRC Carrier | 14 months | 2007. 03 |
Exhaust Gas Driven Absorption Chiller & Heater Development of related components |
UTC Power Carrier | 6 months | 2006. 12 |
Commercialization and development of low-temperature water 2-stage Absorption chillers (75-820RT) |
Korean Association of Air Conditioning, Refrigerating and Sanitary Engineers, Korea District Heating Corp., |
20 months | 2006. 11 |
Research Performance
Name of research commission Service supplier Service term Service completion day |
---|
Cooling, heating and hot water supply 2-stage absorption chiller development service Korea District Heating Corp 19 months 2015.03 |
Research service for developing a prototype of high-efficiency low-temperature water 2-stage Absorption chillers Korea District Heating Corp 21 months 2014.03 |
Project for developing absorption heat pumps Ministry of Knowledge Economy, Korea Institute of Energy Technology Evaluation and Planning 24 months 2013. 06 |
Project for developing Absorption chillers for ships (on condition of purchasing) Ministry of SMEs and Startups, Korea Evaluation Institute of Industrial Technology, Samsung Heavy Industries 12 months 2012. 05 |
Development of a vacuum concentration system Korea Environmental Industry Technology Institute 40 months 2011. 08 |
Analysis of cases regarding application of absorption heat pumps Korea District Heating Engineering Co., Ltd 6 months 2010. 05 |
Test for demonstrating the effects of differential temperature improvement following improvement of district heating flow control systems Korea District Heating Engineering Co., Ltd 6 months 2010. 05 |
Development of a low-temperature water 2-stage absorption chilling and heating system Korea District Heating Corp 22 months 2010. 06 |
Survey of actual conditions of district chilling apartment house chilling system operation Korea District Heating Corp 19 months 2009.03 |
Service for optimizing apartment house district chilling Korea District Heating Corp Korean Association of Air Conditioning, Refrigerating and Sanitary Engineers 7 months 2007. 09 |
Installation of welded plate-type heat exchangers and field tests Korea District Heating Engineering Co., Ltd 25 months 2008. 06 |
Designing of special Absorption chillers for chemical plants Century Corp 6 months 2007. 03 |
Single Effect 2 Lift Hot water Driven Absorption chiller (75~820RT) UTC Power UTRC Carrier 14 months 2007. 03 |
Exhaust Gas Driven Absorption Chiller & Heater Development of related components UTC Power Carrier 6 months 2006. 12 |
Commercialization and development of low-temperature water 2-stage Absorption chillers (75-820RT) Korean Association of Air Conditioning, Refrigerating and Sanitary Engineers, Korea District Heating Corp., 20 months 2006. 11 |