R&D Center

World Energy Research Institute will broaden the scope of its development areas in addition to absorption chillers and chillers to create a better future. Based on long experience and technological knowhow, the institute will engage in efforts to promote continuous growth by broadening its research activities.

Date of establishment (the first approval date) : Jan. 25, 2011

Name : World Energyresearch institute

Location : 3rd Fl., 21, Changmal 1-gil, Sangnok-gu, Ansan-si, Gyeonggi-do, Republic of Korea (15521)

Development field : Design and control of absorption chiller

Research Performance

Name of research commission Service supplier Service term Service completion day
Cooling, heating and hot water supply 2-stage absorption chiller development service Korea District Heating Corp 19 months 2015. 03
Research service for developing a prototype of high-efficiency low-temperature water 2-stage Absorption chillers Korea District Heating Corp 21 months 2014. 03
Project for developing absorption
heat pumps
Ministry of Knowledge Economy, Korea Institute of Energy Technology Evaluation
and Planning
24 months 2013. 06
Project for developing Absorption chillers for ships (on condition of purchasing) Ministry of SMEs and Startups, Korea Evaluation Institute of Industrial Technology,
Samsung Heavy Industries
12 months 2012. 05
Development of a vacuum concentration system (in the third year in three years) Korea Environmental Industry Technology Institute 40 months 2011. 08
Analysis of cases regarding application
of absorption heat pumps
Korea District Heating
Engineering Co., Ltd
6 months 2010. 05
Test for demonstrating the effects
of differential temperature
improvement following improvement
of district heating flow control systems
Korea District Heating
Engineering Co., Ltd
6 months 2010. 05
Survey of actual conditions
of district chilling apartment house
chilling system operation
Korea District Heating Corp 22 months 2010. 06
Development of a low-temperature water 2-stage absorption chilling
and heating system
Korea District Heating Corp 19 months 2009. 03
Service for optimizing
apartment house district chilling
Korea District Heating Corp
Korean Association of Air Conditioning, Refrigerating
and Sanitary Engineers
7 months 2007. 09
Installation of welded plate-type
heat exchangers and field tests
Korea District Heating
Engineering Co., Ltd
25 months 2008. 06
Designing of special Absorption chillers
for chemical plants
Century Corp 6 months 2007. 03
Single Effect 2 Lift Hot water Driven Absorption chiller (75~820RT) UTC Power UTRC Carrier 14 months 2007. 03
Exhaust Gas Driven
Absorption Chiller & Heater
Development of related components
UTC Power Carrier 6 months 2006. 12
Commercialization and development
of low-temperature water
2-stage Absorption chillers (75-820RT)
Korean Association of Air Conditioning, Refrigerating
and Sanitary Engineers,
Korea District Heating Corp.,
20 months 2006. 11
Research Performance
Name of research commission
Service supplier
Service term
Service completion day
Cooling, heating and hot water supply 2-stage absorption chiller development service
Korea District Heating Corp
19 months
2015.03
Research service for developing a prototype of high-efficiency low-temperature water 2-stage Absorption chillers
Korea District Heating Corp
21 months
2014.03
Project for developing absorption heat pumps
Ministry of Knowledge Economy, Korea Institute of Energy Technology Evaluation and Planning
24 months
2013. 06
Project for developing Absorption chillers for ships (on condition of purchasing)
Ministry of SMEs and Startups, Korea Evaluation Institute of Industrial Technology, Samsung Heavy Industries
12 months
2012. 05
Development of a vacuum concentration system
Korea Environmental Industry Technology Institute
40 months
2011. 08
Analysis of cases regarding application of absorption heat pumps
Korea District Heating Engineering Co., Ltd
6 months
2010. 05
Test for demonstrating the effects of differential temperature improvement following improvement of district heating flow control systems
Korea District Heating Engineering Co., Ltd
6 months
2010. 05
Development of a low-temperature water 2-stage absorption chilling and heating system
Korea District Heating Corp
22 months
2010. 06
Survey of actual conditions of district chilling apartment house chilling system operation
Korea District Heating Corp
19 months
2009.03
Service for optimizing apartment house district chilling
Korea District Heating Corp
Korean Association of Air Conditioning, Refrigerating and Sanitary Engineers
7 months
2007. 09
Installation of welded plate-type heat exchangers and field tests
Korea District Heating Engineering Co., Ltd
25 months
2008. 06
Designing of special Absorption chillers for chemical plants
Century Corp
6 months
2007. 03
Single Effect 2 Lift Hot water Driven Absorption chiller (75~820RT)
UTC Power UTRC Carrier
14 months
2007. 03
Exhaust Gas Driven Absorption Chiller & Heater
Development of related components

UTC Power Carrier
6 months
2006. 12
Commercialization and development of low-temperature water 2-stage Absorption chillers (75-820RT)
Korean Association of Air Conditioning, Refrigerating and Sanitary Engineers, Korea District Heating Corp.,
20 months
2006. 11

바로가기

Shortcut