Period: May 14, 2018 ~ October 13, 2019 (Total 1.6 year)
Place: Pan-gyo Startup Campus
Model: 2ABH210 (193usRT) x 2 units
Period: January 2, 2019 ~ February 28, 2019
Place: Performance Test Center in World Energy
Change of flow rate and pump power by the inverter control of the cooling and chilled water pump.
When the load is changed, maintain the normal condition of the pump rotation speed, the surface temperature on the pump motor and the chiller operation.
Check the precise operation of flow detection switch.